Projects

Culture-Entertainment

<<Previous project

REPAIR - PLANNING - MODERNIZATION OF THE ARCHAEOLOGICAL MUSEUM OF RETHYMNO

REPAIR - PLANNING - MODERNIZATION OF THE ARCHAEOLOGICAL  MUSEUM OF RETHYMNO

Strengthening - repair of the existing building in Rethymno, inside the Fortress of Fortetsa. It is a 1970's addition of poor quality construction and has suffered irreversible damages due to corrosion of the reinforcement. The demolition and reconstruction of the building was proposed. The Central Archaeological Council accepted the design based on a new preliminary study for the construction of a new establishment inside the Fortress.

  • Client: MINISTRY OF CULTURE DIRECTORATE OF MUSEUM DESIGNS
  • Design Stages: Preliminary Study
  • Budget (Structural): 1,000,000 €
  • Project State: he design was interrupted after the Preliminary design phase due to financing problems. The project will not be completed.
  • Architectural Design: H. K. BOUGADELIS & PARTNERS ARCHITECTS S.A. (A.E.T.E.R. S.A.)
  • E/M Study: TRIEDROS MELETITIKI Ltd.

<<Back

  • 45 Koniari str. & Alexandras Ave., Athens, 11471
  • ·
  • Tel. +30 210 6437078
  • ·
  • Fax +30 210 6456569
  • ·
  • e-mail: info@hellinikimeletitiki.gr