Projects
Health
BUILDING INFRASTRUCTURE FOR THE INSTALLATION OF A LINEAR ACCELERATOR AT THE 401 GENERAL MILITARY HOSPITAL OF ATHENS
Detailed design of a Linear Accelerator and its auxiliary support areas at the 401 Military Hospital. The study includes renovation of part of the existing basement of the building and the addition of an underground 3 storey building (semi-basement and 2 basements), by extension and in contact with the existing building. The project includes the Linear Accelerator room, the Brachytherapy room, the Simulator room, Doctors' Offices, Examination rooms, Auxiliary Personnel rooms and circulation areas.
Total area of the extension: 1,192 m²
Total renovated area: 180 m²
A temporary retaining structure, using the anchored piles method was designed, due to the important depth of the excavation.
The foundation was a semi-sealed raft.
- Client: HELLENIC ARMY GENERAL STAFF
- Design Stages: Scheme and Detailed Design, Tender Documents
- Budget (Structural): under preparation (12/2008)
- Design Period: 2007 – 2008
- Project State: The approvAL of the Detailed Design and the preparation of the Tender documents is pending (12/2008)
- Architectural Design: BETAPLAN A.E.M.
- E/M Design: ALKON MELETITIKI Ltd
