NEW WING AT THE MITILINI GENERAL HOSPITAL ("VOSTANIO")
Reinforced concrete Medical and Intensive care units, by extension of the existing building, covering a total area of 4,500m².
Structural design in collaboration with A. & P. FOTIADIS - DOMIKI MELETITIKI Ltd (L. PANTALEON)
Due to lack of funding, after the approval of the preliminary design for the whole project, the unified scheme-detailed design stage was divided in two separate implementation phases. Phase 1 includes the new building N1 and the biological treatment unit, whereas the 2nd phase is the new building N2. The latter consists of 4 independent structures.
- Client: MITILINI GENERAL HOSPITAL ("VOSTANIO") - MINISTRY OF HEALTH & WELFARE
- Design Stages: Preliminary, Scheme and Detailed Design and preparation of Tender documents in two phases
- Budget (Structural): 1,850,000 €
- Design Period: 03/2000 – now
- Project State: The Scheme and Detailed Design and Tender documents have been approved. The 1st phase is under tender (09/2011)
- Architectural Design: BETAPLAN S.A. - T. GAVRILIS & PARTNERS
- E/M Design: ALKON MELETITIKI Ltd - G. SFETSOS