Projects
Strengthening and retrofitting
<<Previous projectNext project>>
STRENGTHENING OF THE HELLENIC CENTRE FOR MARINE RESEARCH "TRITON" BUILDING
Strengthening and seismic upgrade of a reinforced concrete building in Saronida, Attiki, former SARONIC GATE Hotel, covering a total area of 5,000m² for its tranformation into the National Center of Marine Research.
- Client: MINISTRY OF DEVELOPMENT / PSIKTIKI ELLADOS S.A. / GNOMON S.A.
- Design stages: Scheme Design (Tender Study) - Detailed Design
- Budget (Structural): 1,379,310 €
- Design period: 09/1998 - 07/1999
- Project Stage: Completed
- Architectural Design: G. ZAKINTHINOS - TH. XANTHI - TH. ANDROULAKIS
- E/M Design:E/M Ltd.
