DEWATERED SLUDGE THERMAL DRYING UNIT IN THESSALONIKI
Structural design for various establishments in this dewatered sludge treatment plant was performed. Most important of all, the main drying unit, is a steel 19m high building, 35 X 25 m in plan, with heavy equipment loads and overhead traveling cranes. The rest of the structures include SILO's foundation and steel supporting system, various liguid tanks, a steel bridge for pipeline support e.t.c. All the projects have been designed and positioned according to the electromechanical requirements of the tender documents.
Note: the above pictures are taken from an equivalent project in Psitalia, Atiki.
- Client: J/V AKTOR S.A. – ETETH S.A. / MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING & PUBLIC WORKS
- Design stages: Scheme design
- Budget (Structural):
- Design period: 07/2008 – 11/2008
- Project State: The tender was cancelled
- Architectural Design: Vasilios Adaloglou
- E/M Design: MELCON Engineering