Projects
Sports
<<Previous projectNext project>>
OUTDOOR SWIMMING POOL IN CHANIA, CRETE
Olympic dimensions and specifications swimming pool with Administration building and reinforced concrete stands, replacing an existing swimming pool.
- Client: GENERAL SECRATARIAT OF SPORTS - G. KATSIVALIS
- Design stages: Scheme Design (Tender Study) - Detailed Design
- Budget (Structural): 293,470 €
- Design period: 03/1991 - 09/1991
- Project Stage: Completed
