DESIGN FOR THE RELOCATION OF THE RAILWAY TRUCK BETWEEN IASMOS-POLYANTHOS AND KOMPSATOS BRIDGE

Design of the new railway bridge at Kompsatos river, that is transferred due to the construction of the new High Speed line and probably a bridge at the new Iasmos station. Design for the strengthening of the pile foundation of the existing Kompsatos bridge. The strengthening project will be set out to tender assessment, in order to have the bridge repaired before the completion of the new planning and the construction of the new Kompsatos bridge.

All participating public bodies must express their opinion about the project, because of the decision to build a new station, that was not included at the initial Contract. The Environmental Impact Design was recently approved.

  • Client: OSE S.A.
  • Design stages: Preliminary and Scheme designs
  • Budget (Structural): -
  • Project Stage: Under design
  • Transport Design: TH. MAZIS (CH. ALIBERTIS)
  • Environmental Design EDAFOMICHANIKI - EREVNITIKI S.A.
  • Geotechnical: EDAFOMICHANIKI - EREVNITIKI S.A.