T2N BRIDGE OVERCROSSING OF HIGH SPEED RAILROAD
National Road Athens-Thessaloniki Overcrossing of High Speed Railroad, near the town of Katerini. The bridge comprises of 3 spans. The total length is 67,38m and the construction is made of prefabricated pretensioned beams with reinforced concrete deck slab. The design was carried out for the construction contractor (DYNAMIKI S.A.), in collaboration with KARANIKOLAS & PARTNERS S.A. Structural Design Office.
- Client: MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING & PUBLIC WORKS - DYNAMIKI S.A.
- Design stages: Detailed design (final stage)
- Budget (Structural): 646,022 €
- Design period: 09/2000 - 12/2000
- Project Stage: Completed