Projects

Infrastructure

<<Previous projectNext project>>

EGNATIA ODOS CHECK OF 4 BRIDGES

Check of four bridge designs carried out by
OMETE S.A. (2 projects) and
VASIS - SYSM S.A. (2 projects) Offices

  • Client: EGNATIA ODOS
  • Design stages: Checking of the Scheme Designs
  • Budget (Structural): 13,043,000.00 €
  • Design period: (α) 07/02/2005, (β1) 17/03/2005, (β2) 17/11/2004 - 2005
  • Project Stage: Under Construction

<<Back

  • 45 Koniari Str. & Alexandras Ave., Athens, 11471
  • ·
  • Tel. +30 210 6437078
  • ·
  • Fax. +30 210 6456569
  • ·
  • email: info@hellinikimeletitiki.gr