Projects
Infrastructure
<<Previous projectNext project>>
EGNATIA ODOS: G5 BRIDGE OF THE 4.125 SECTION (PANAGIA - GREVENA)
Prestressed Road Bridge
- Client: EGNATIA ODOS
- Design stages: Detailed design (final stage)
- Budget (Structural): 3,000,000.00 €
- Design period: 12/2002 - 09/2004
- Project Stage: Under Construction
