EGNATIA ODOS SECTION 5.1: POLYMILOS - LEFKOPETRA
2,300m long double lane tunnel at Polymilos. The tunnel was designed in collaboration with EDAFOMICHANIKI S.A. The above mentioned firm designed the temporary excavation works while HELLINIKI MELETITIKI designed the final lining.
- Client: EGNATIA ODOS S.A.
- Design stages: Detailed design (final stage)
- Budget (Structural): 79,236,977 €
- Design period: 02/1999 - 05/2000
- Project Stage: Completed
- Geotechnical - temporary works: EDAFOMICHANIKI S.A.