TECHNICAL WORKS AT THE HYDRAULIC PROJECT OF THE OLD AND NEW PINIOS RIVER BANKS - LARISSA

TECHNICAL WORKS AT THE HYDRAULIC PROJECT OF THE OLD AND NEW PINIOS RIVER BANKS - LARISSATECHNICAL WORKS AT THE HYDRAULIC PROJECT OF THE OLD AND NEW PINIOS RIVER BANKS - LARISSA

Entrance and exit works for the hydraulic project. Retaining walls on piles, etc. Works for the manipulation of Pinios river bank. Design of two types of multi-purpose pedestrian bridges.

  • Client: Ministry for the Environment, Physical Planning & Public Works
  • Design stages: Detailed design (final stage) and preparation of tender documents
  • Budget (Structural): 1,204,702 €
  • Design period: 06/1996 - 06/1999
  • Project Stage: Completed
  • Hydraulic Design: ECOS ΜΕΛΕΤΗΤΙΚΗ S.A.
  • E/M Design: G. KAFETZOPOULOS - I. PRITANIKO - A. BENAKIS BROS LP.